QK, Inc. – Ins and Outs of Well Design

Course Description

QK, Inc. – In’s and Out’s of Well Design
(Click Below for a Printer Friendly Version)

2017 Schedule
June 8, 2017: Santa Rosa (Sonoma county): Location: TBA

November 7, 2017: Modesto (Satanislaus County): Location: TBA

MAIN TOPICS:

Selection of Water Well and Booster Pump Equipment
– Power is one of the major costs for a Utility.
– Learn how to select pumps and controls that are right for your system and application.
Efficient Operation of Wells and Well Fields
– Learn how to evaluate and monitor the efficiency of your wells and water system and to operate your system at its optimum efficiency.
Zone Testing for Water Wells
Why pay to drill and equip another hole?
– Learn about zone testing and when this procedure could be used to improve the water quality of existing well water.
Groundwater Monitoring and Reporting
– Understand U.S. EPA’s and SWRCB’s monitoring and reporting schedule and the possible waivers that could reduce your monitoring.

Who Should Attend:  This class is designed for Water Managers, Water Specialists, Board Members, and Engineers.

Registration: 8:00 am – 8:30 am
Classroom Session: 8:30 am – 3:30 pm
Lunch: 12:00 pm – 1:00 pm (provided by QK, Inc.)
Membership Price: $125

$175.00

Are you a member?

Category: Tags: ,